A Full Range of Container Handling Services

The Terminal provides round-the-clock ship services, 7 days a week:

- Container loading and unloading
- Stuffing and unstuffing
- Container inspection and repair
- Reefer Handling and Storage

Terminal Site

Quay side
- 1,500 m quay length
- 930,000 m2 site area
- Container Yard size 250,000 m2
- Minimum water draught of 14.3 meters
- 5 x 1000m railway tracks
- 3+3 road lanes gate
- 35,310 Teus container stacking capacity
Vessel to Shore cranes
- 8 Super Post Panamax Quay Cranes with 65 tons lifting capacity under hook and 45 tons under spreader.
- 1 Mobile Harbour Crane 100 ton lifting capacity
Yard cranes
- 22 Rail Mounted Yard Gantry Cranes with 40 tons lifting capacity
- 3 Reach Stackers with 40 tons lifting capacity
- 5 Side Loaders with 10 tons lifting capacity
Rail cranes
- 2 rail gantry cranes with 40 tons lifting capacity
Refrigerated containers
- The terminal is equipped with 900 x 380 volts reefer plugs
Data above as of June 2003

 

Operations Supported with Advanced Information Technology

As a part of TCT's commitment to providing cost effective excellence, planning and resource allocation operations are placed in an innovative and modern Administration Center.

The Operations Control Tower allows planners and operation manager to maintain both IT and visual control over quay and yard operations.

To maximize handling efficiency, all TCT operations are supported by market-leading control system:

- Oracle Based Ship Stowage Planning system to facilitate ship operations

- Yard Planning system to optimize the use of yard facilities and cut operation time

- Real Time Container Tracking system to keep updated container records